← All case studies
Case 02 · Team plan, Field service

Three technicians,jobs of everylength.

A Greater Springfield carpet and upholstery cleaning business trading since 1999, running three technicians with a van each. Job length is the whole problem: an even split of stops is not an even split of the day.

The three Nu-Look technicians at the open rear doors of their van, with the truck-mounted extraction unit and coiled hoses behind them
The Nu-Look team and one of the vans, Greater Springfield.
Nu-Look — at a glance
Sheet 01
Key facts about Nu-Look.
BusinessNu-Look Carpet & Upholstery Cleaning
Trading since1999
BasedSpringfield QLD — Greater Springfield, Ipswich and surrounds
TeamThree cleaning technicians, one van each
Work routedCarpet and upholstery cleaning, tile and grout, leather, repairs, vacate cleans
PlanTeam
Used forJob assignment, sequencing around time on site, live status, proof of completion

Greater Springfield, Ipswich and surrounding suburbs, Queensland

01 · The problem

Field service is not a parcel round

A courier's stops are roughly interchangeable — two minutes at the door, then the next one. A cleaning day is not built that way. One booking is forty minutes of upholstery; the next is a four-bedroom vacate clean that will hold a technician until mid-afternoon.

Split that day evenly by number of jobs and one van finishes at two while another is still working at seven.

  1. 01Job lengths vary by hours, so an even split of stops is not an even split of the day.
  2. 02Vacate cleans are deadline work — a handover does not move because a job ran late.
  3. 03Assigning by suburb sent two technicians past each other on the motorway.
  4. 04A job that ran over meant phone calls, not a re-plan.
02 · How it works

How they run the day

  1. 01

    Bookings become stops

    Each job is entered with its address, the service type and how long that service takes at the door.

  2. 02

    The day is divided across three technicians

    By hours available and where each van starts, not by postcode — so nobody finishes at two and nobody finishes at seven.

  3. 03

    Deadline jobs get a window

    Vacate cleans tied to a handover carry a time window the solver has to satisfy, and it reports if the day cannot hold it.

  4. 04

    The technician works the list

    Next job, address, access notes and the expected time on site, on the phone. Navigation hands off to whatever they already use.

  5. 05

    Completion is evidenced

    Photos and a completion time land against the job, ready for the agency or the invoice.

Time on site is not a note beside the booking. It is the number the solver divides the day by.

Time on site, by service
Time on site, by service
Upholstery — lounge suite45 min
Standard carpet clean, 2 bed90 min
Tile and grout, wet areas2 h
Vacate clean, 4 bed + flea spray4 h
Burn or seam repair30 min
03 · What changed

What the change actually was

The day is visible

Three technicians on one board. Who is where, what is left, and which van can take the call that just came in.

Long jobs sit right

Because time on site is part of the plan, a half-day vacate does not get stacked behind two other bookings.

Proof for the agency

Photos and completion times attached to the job, so a bond query is answered with a record rather than a recollection.

Described as operations, not as a percentage. We publish figures for a named customer only once they are measured and the customer has seen them.

Two or three vans and a diary?

Put next week's bookings in and see where the solver puts them. The free tier is enough to judge it.